This month, our featured NWAHBA Member is Stabil-Loc and their pre-construction piering system. Read on to learn more about this patented foundation piering system.
 
The hydraulically driven Stabil-Loc pre-construction pier is installed prior to pouring the foundation in areas of unstable soils. Future settlement of the structure is no longer a concern. The ICC-compliant Stabil-Loc pre-construction pier consists of a 30″ long starter segment, 30″ long interlocking segments, capped by a 100 sq. in. gusseted top bearing plate.
 
Real Strength
Stabil-Loc Piers are ICC-rated to hold up to 262,000 lbs. per pier.
 
Revolutionary Piers
The Stabil-Loc piering system is so revolutionary, it is patented by the United States Patent Office.

Over 50,000 Installations… ZERO failures

 


 
GET MORE INFO ON THE STABIL-LOC FOUNDATION PIERING SYSTEM
 
For additional engineering, sales or account information, please contact Steve or Ginger at Stabil-Loc to learn more today.


Stabil-Loc- 2075 Long Street, Springdale AR 72764
 

Steve Patton, Company Founder
steve@stabil-loc.com
(479) 320-7117

Ginger Demaris, President
ginger@stabil-loc.com
(479) 282-9298